5. Signal Generator Power On/Off
This chapter introduces the power on/off steps of the equipment in detail.
5.1 Check before the first power-on
5.1.1 Completeness
Refer to the “Packing List” to check whether the accessories accompanying the device are complete. If you find that the accessories are missing or damaged, please contact Corech Microwave or authorized dealers in time.
5.1.2 Appearance
When receiving the equipment, check the packaging, the appearance of the equipment and the display screen in order, if there is any deformation or damage, please contact Corech Microwave or authorized dealers.
5.2 Signal Generator Connection
5.2.1 Ground
Connect the grounding post @“G” on the rear panel to the ground wire, and ensure that the ground wire is reliably grounded, floating or poor grounding may lead to the cause personal injury and equipment damage.
5.2.2 AC Power Connection
110V/220V, 50-60GHz adaptive power supply. Use the supplied power cord to connect the AC power port @“M” on the rear panel to the external power socket and ensure a reliable connection.
5.3 Power on operation
5.3.1 Start
After make sure the correct GND and AC connection, you can start powering on the equipment.
5.3.2 Standby
Press the “|” direction on the AC switch @“K” on the rear panel, the switch glows red. Meanwhile, The red light on the DC switch@“A” on the front panel is on, the equipment goes into standby state.
5.3.3 Power on
In the standby state, press the DC switch, as its green light on, the equipment powers on. At approx. 15s later, the equipment goes into operation state.
5.4 Power off operation
5.4.1 Standby
In the operation state, press the DC switch, as its green light off, red light on, the equipment goes into standby state.
5.4.2 Power off
In the standby state, press the “o” direction on the AC switch, its red light off. Meanwhile, the red light of the DC switch off at 3s later, the equipment goes into power off state.